Monday, October 27, 2008

Final touches!!




This is part of the kitchen island that will house the dishwasher and sink, as well as a bar that we can eat quick meals at. The flooring is a laminate type floor that looks like rock. That was a huge mess, as they didn't install it right the first time, so they had to redo it, which was a 2 day delay.







Finally!!!! A real toilet that works!! Dan was getting real tired of having to plaunge the camper toilet---- now he has a real throne!!!














The fireplace mantel is almost finished. This is where the pellet stove and big screen tv will go.





Staining and polyurithaning the inside was just as time consuming as the outside!! The hardest part was the top of the log siding inthe loft. But it sure turned out good.













Thursday and Friday night we camped out in the loft-- which was a good thing because the water in the camper froze!!! What perfect timing!!









Abbey and Dan relax on the new carpet that was installed late Saturday night. We began moving bedroom furniture in at 9:30 in the kids rooms, finally put them to bed at 11pm, then finished our bedroom. What a long night!! We get the living room carpet on Tuesday!!!



No comments: